GK Quiz, General Knowledge, Latest Current Affairs, Business Quiz, Management Quiz, Finance, Project Management, PMP Resources, IT Quiz, Bollywood Quiz, Finance, HR, OB, Supply Chain Management, Multiple Choice Questions, Bank PO Entrance Exam Questions, Civil Services Question Bank, Quant, Verbal, GMAT, SAT, TOEFL Resources Questions, Numerical Ability, Fun Quiz, KBC

Project Management Quiz - 27

1. Project managers must know:
[A]What kind of message to send
[B]to whom to send the message
[C]how to translate the message into a language that everyone can understand
[D]All of the above
[E]A and B only



2. Quality attributes
[A]are used to determine how effectively the organization accomplishes its goals
[B]can be objective or subjective in nature
[C]are specific quality characteristics for which a product is designed, built, and tested.
[D]A and B.
[E]B and C



3. Risk event probability is defined as:
[A]the total number of possible events divided into the expectations or frequency of the risk event
[B]the number of times the risk event may occur
[C]the fraction of the total project tasks which may be affected by the risk event
[D]the total number of possible events divided into the consequences of the risk event.
[E]A and B



4. Scheduling systems such as PERT, ADM, and PDM are project management tools to be used by:
[A]The project manager and project office personnel.
[B]The project team and functional managers.
[C]The project sponsor.
[D]All of the above.
[E]A and B only.



5. The planned cost for the total project at its inception is called the _____.
[A]Cost of goods sold.
[B]Depreciable value.
[C]Budgeted cost.
[D]All of the above.
[E]B and C only.



6. A process characteristic has a true mean of 150 and a true standard deviation of 20. A sample of 25 items is taken from this process. The standard error of the estimate is:
[A]0.2
[B]0.8
[C]4
[D]5
[E]7.5



7. Network schedules are prepared during the _____ phase and updated during the _____ phase.
[A]Conceptual, execution.
[B]Development, implementation.
[C]Development, close-out.
[D]Implementation, close-out.
[E]Planning, finishing.



8. Scope Management:
[A]entails managing the project's work content.
[B]is a subset of configuration management and as such is performed by CM specialists.
[C]is concerned with naming all activities performed, the end products which results and the resources consumed.
[D]is not a concern of the project manager.
[E]None of the above.



9. The methods and techniques for determining the economic costs, the environmental impact, the economic returns, and the probability for success are called:
[A]Feasibility studies.
[B]Bills of materials.
[C]Pert charts.
[D]Managerial reserves.
[E]None of the above



10. The traditional organizational form has the disadvantage of:
[A]Complex functional budgeting
[B]Poorly established communication channels
[C]No single focal point for clients/sponsors
[D]Slow reaction capability
[E]Inflexible use of manpower



11. Things that distort, distract, or muddle the communication process are called:
[A]noise
[B]selective filtering
[C]selective perception
[D]medium problems
[E]All of the above.



12. Which is not a consideration in a make or buy decision?
[A]Cost factors (least cost alternatives)
[B]Competitors' method of sourcing
[C]Existence of sufficient administration/technical personnel
[D]Political and social factors
[E]None of the above.



13. A Work Breakdown Structure:
[A]assures all work is identified
[B]subdivides the project into manageable segments
[C]provides the project sponsor with a time-phase task summary
[D]both A and B
[E]All of the above.



14. A project manager can exchange information with the project team using which media?
[A]tactile
[B]audio
[C]olfactory
[D]visual
[E]All of the above.



15. During project execution, the customer authorizes and funds a scope change which requires a major change in the schedule. The baseline schedule:
[A]Now becomes the new schedule, including the changes, and the original baseline is disregarded.
[B]Is still the original baseline but annotated to reflect that a change has taken place.
[C]Is amended to reflect the scope change, but the original baseline is still maintained for post-project review.
[D]Is meaningless since every schedule update changes the baseline (i.e., a rubber baseline.)
[E]Is the same since baseline schedules cannot change once the development phase is completed.